Automation

We connect machines and controllers

We collect machine state, cycles, downtime and scrap from the stations into one data layer, including machines with no digital interface. Your controllers stay, and we plan the work around production.

ROBOTIC CELLANDON

Scope of work

From the shop-floor audit to support after go-live

First we check what is already on the floor and what we can read from it. Then we add what is missing.

Machine park audit

We list controllers, panels and networks. For each machine you know what we can read straight away and what needs retrofitting.

PLC integration

We read states, counters and alarms, mainly from Siemens SIMATIC S7 controllers, without changing the machine program.

Protocols and network

OPC UA, plus Modbus/TCP and MQTT for other controllers. We separate the shop-floor network from the office network.

Retrofit and sensors

We fit older machines that lack an interface with vibration, temperature, cycle and power sensors. The operator types nothing in.

SCADA and HMI panels

Process visualisation and alarms at the machine. We send the same signals on to the MES on the floor, the warehouse and Power BI for the board.

Support and development

Care after start-up: new machines, line changes, updates. You own the documentation, so you can work with someone else.

How the data flows

One reading for the floor, the warehouse and the ERP

We read a signal from a controller or sensor once and send it to the floor, the data warehouse, the board reports and the ERP. We do not connect the machine separately for each report, so everyone sees the same number.

Sources on the floor

  • Siemens SIMATIC S7 controllers (OPC UA)
  • Other controllers over OPC UA, Modbus/TCP or MQTT
  • IIoT sensors on older machines

How it runs

From the audit to data on screen

  1. 01

    Audit

    We review the floor, controllers and network. You get a machine list showing what we can read.

  2. 02

    Pilot

    We connect one line or cell and check the data live.

  3. 03

    Roll-out

    We connect more machines and retrofit the ones missing a signal.

  4. 04

    Care

    We service the installation and make line changes together with the plant.

The quote depends on the number of machines and the state of their controllers. We give it after the audit, before you sign.

Next step

Let’s start with an audit of one line

We will check what we can read from your machines today and tell you what is missing.