Power BI reporting

Power BI reporting without stitching by hand

We take data from the ERP, CRM and files to a report you open before the board meeting or the morning stand-up. We leave you a model your team can develop without us.

PLCSemantic modelDAX measuresHyperVision MESANDON78%OEE · current shiftmeasurement at sourcePLC controllerdatabasesemantic modelvisualisation

Scope of work

Six layers of the project

BI projects often end with a good-looking report on bad data. We build every layer, from sources to security.

Data sources

ERP, CRM, SQL databases and the files you already have. We add machine data if you collect it. We connect machines through our separate Automation service.

Integration layer

ETL, validation and normalisation of data from many sources. A warehouse in Microsoft Fabric or on your existing infrastructure.

Semantic model

DAX measures for sales, margin and costs, and in production for OEE, MTBF and takt. The whole company calculates each metric from one definition.

Reports for people

Separate views for the board, finance, sales and production. Each department sees the metrics it can influence.

Automatic refresh

The report refreshes on a schedule. Nobody exports data by hand or copies a “final_v3” file.

Security and compliance

Row-level security (RLS), data in your own Microsoft 365 tenant, version control and model documentation.

An example from production

OEE broken down by cause

A figure of 64% does not tell you what to fix. The report shows how many points went to changeovers, micro-stops and quality rework, split by shift.

We calculate the same model for a line, a cell and a single machine, so you identify the bottleneck from data.

ANATOMY OF OEECalendar time100%Availability82%less downtime and changeoversx Performance71%less micro-stops and slow runningx Quality = OEE64%less scrap and reworkA percentage point of OEE is machine hours you pay for. First we show where you lose them.

Where the data comes from

We start from what is already connected

Reports draw on the systems already running in the company. We load sales from the ERP, costs from accounting and production from the MES into one model, so a number means the same in every department.

Data warehouse on Microsoft Fabric
  • ERP: Comarch, enova365, Symfonia, SAP, Dynamics 365
  • SQL Server, Oracle, PostgreSQL and MySQL databases
  • CRM and online shops
  • Excel and CSV files on SharePoint and OneDrive
  • MES, APS and CMMS systems
  • Machine, PLC and SCADA data (Automation service)

Pricing

Three Power BI implementation packages

Prices are net of VAT. Pilot has a published entry threshold. We quote Standard and Scale individually, because the amount depends on the number of data sources and access to them. We give it after the workshop, before you sign.

Pilot

One area, one report

from 8,000 PLN

net · 2–3 weeks

Proof of value on real company data.

  • Analysis of one area, such as sales or production
  • One data source connected (ERP / database / file)
  • One Power BI report with the key KPIs
  • Kick-off workshop and handover of the report
  • Recommendations for the next steps
Quote the Pilot package

Standard

most often chosen

Several areas of the company

Quoted individually

after a call with the sales team · 4–6 weeks

A consistent reporting layer for departments and the board.

  • Several company areas in one model
  • One semantic model (single source of truth)
  • 5 reports: departments + management
  • For example sales and margin, costs, and OEE and scrap in production
  • Automatic refresh and row-level security (RLS)
  • Team training on working with the reports
Let’s talk about scope

Scale

The whole company, many systems

Quoted individually

after a call with the sales team · 8–12 weeks

A data architecture for the whole company.

  • The whole company and multiple source systems
  • Data warehouse on Microsoft Fabric
  • Predictive models and anomaly detection
  • Integrations with ERP, CRM and line-of-business systems
  • Post-implementation support and report development
  • Technical documentation and know-how handover
Let’s talk about scope
Additional report beyond the package: from 2,000 PLN net per report. We quote model extensions and new data sources individually after analysis. You know the amount before work starts.

Next step

Let’s start with a pilot on one area

In two to three weeks you get one report on your data and decide whether to go further.