MES implementation

HyperVision implementation in four stages

We start with one line on the system core, then add more. You decide on the next step once the previous one runs on the floor.

1Workshop90 minStations and metrics,module set2Auditon the floorMachines, network, server,ERP data3Pilot1 lineSystem coreon the first stations4Roll-outmore linesMore stations,lower rateWe work in stages. After each one you get something that runs on your data.

Stage 01 · Kick-off workshop

We agree what the system should show

90 minutes, free of charge

  • We talk through the process, the stations and the most frequent stoppages
  • We pick the metrics and the stations for the first stage
  • We choose the modules for the whole implementation
  • You leave with a written note and a quote in ranges

Stage 02 · Integration audit

We check what stands on the floor and what the ERP exposes

on the floor · integration quoted separately

  • We walk the floor and list the machines, controllers and network
  • We decide where an operator panel is enough and where a machine read-out or a sensor is needed
  • We check the plant server and network the system will run on
  • We agree the scope of data exchange with the ERP

Stage 03 · Pilot

One line on the system core

one line · subscription per station

  • HyperVision installed on the plant server, inside a closed network
  • Andon, production recording and OEE on the first stations
  • Training for operators, shift supervisors and maintenance
  • First shift reports and a downtime Pareto from real events

Stage 04 · Roll-out

More lines and stations

more lines · lower price threshold

  • Further lines and cells, usually after the first quarter
  • The subscription rate falls as the number of stations grows
  • We add a module outside the agreed set in a separate integration project with its own quote
  • Data for Power BI reporting and the warehouse, if the plant needs it

On your side

What we need from you

We handle the rest.

Somebody who knows the process

2–4 hours a week from someone who knows why the line stops on Thursdays.

A server and network access

HyperVision runs on the plant’s own infrastructure. We need a server or a virtual machine and access to the network the machines work on. We give the requirements after the audit.

A decision on the pilot scope

You pick one line and a module set. A narrower start shows results sooner.

Start

The first step is a 90-minute conversation

The kick-off workshop is free and needs no budget decision. You leave with a list of stations, a module set and a quote in ranges.